Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 023569.0, 023593.00 | Hampden | Pavement Milling, Hot Mix Asphalt Overlay, and Safety Improvements: 023569.00 is located in Hampden on US Route 202, beginning 0.37 of a mile east of Coldbrook Road and extending northeast 2.36 miles to Mecaw Road. 023593.00 is located in Hampden on Route 9, beginning at the intersection of Western Avenue and US Route 202 and extending 0.42 of a mile to the intersection of Western Avenue and US Route 1A. |
Rejected | ||
| 026959.00 | Vassalboro / China | Instream Culvert Replacements: Project is located in various locations on Webber Pond Road and Oak Grove Road in Vassalboro, and on Stanley Hill Road in Vassalboro and China. |
Awarded | ||
| 024579.00 | Westbrook | Pavement Milling, Hot Mix Asphalt Overlay with Safety Improvements: Project is located on Bridge Street in Westbrook, beginning 0.04 of a mile north of Cumberland Street and extending north 0.45 to 0.02 of a mile south of East Bridge Street. |
Awarded | ||
| 023709.00 | Portland / Westbrook | Pavement Milling, Hot Mix Asphalt Overlay, with Drainage Improvements: Project is located in Portland on Route 25, beginning 0.10 mile east of Pine Tree Industrial Parkway and extending southwest 0.97 mile to Larrabee Road in Westbrook, then continuing north 0.93 mile on Larrabee Road to Riverside Street. A portion of the project is located on Main Street (Route 25B) in Westbrook from the Westbrook/Portland city line to 0.04 mile west of Larrabee Road. |
Awarded | ||
| 023987.00, 024587.00 | Yarmouth / Falmouth | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvement:
|
Awarded | ||
| 024465.00, 024933.00 | Rangeley Plantation / Sandy River / Madrid Township / TWP E / Rangeley | Pavement Milling, Ultra-Thin Bonded Wearing Course, with Safety Improvements:
|
Rejected | ||
| 021162.21J | Regions 2 & 4 | Add Shoulder Aggregate to Existing Shoulders, and to provide a Shoulder Machine, with an operator, to add MaineDOT supplied aggregate to existing shoulders behind LCP operations. |
Awarded | ||
| 018995.44 | Pittsfield / Detroit / Newport / Newburgh / Hampden | Crack Sealing. Projects are located in Somerset and Penobscot Counties:
|
Awarded | ||
| 027059.00 | Ashland | Header Repair: Project is located on Route 11, Bridge #3555 in Ashland. |
Awarded | ||
| 020817.00, 020900.00, 021845.00 | Blue Hill / Sedgwick | Pavement Milling, Hot Mix Asphalt Overlay, Cyclical Pavement Resurfacing, with Drainage and Safety Improvements:
|
Rejected | ||
| PH20210317ROL | Regions 1, 2, 3, 4, 5 | On Call Rollers & RC Trench Rollers - Equipment Rental without Operator Awarded to the following:
|
Awarded | ||
| 024923.00 | Caribou / Woodland / New Sweden | Pavement Milling and Ultra-Thin Bonded Wearing Course: Project is located on Route 161, beginning in Caribou at the south junction of US Route 1 and extending northwest 9.80 miles to 0.08 of a mile southeast of the Station Road. |
Awarded | ||
| 024137.00, 024141.00, 024935.00, 024937.00 | Wyman / Carrabassett Valley | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvement:
|
Rejected | ||
| PH20210310BG2 | Region 2 | Buildings & Grounds Maintenance and Repair Services: Located in Region 2 at each MaineDOT facility area. |
Awarded | ||
| 024909.00 | Brunswick / Topsham | Pavement Milling and Ultra-Thin Bonded Wearing Course: Project is located on Route 196, beginning 0.12 of a mile south of the Topsham town line in Brunswick and extending north 1.82 miles to US Route 201 in Topsham, including the Merrymeeting Bay Bridge (#6371). |
Awarded | ||
| 024879.00 | Topsfield / Township of Brookton | Pavement Milling and Cyclical Pavement Resurfacing: Project is located on U.S. Route 1, beginning in Topsfield 3.59 miles north of the intersection with Route 6 and extending north 6.75 miles. |
Awarded | ||
| 023741.00 | Richmond | Construction of a Retaining Wall: Project is located on Route 24, approximately 0.02 mile south of Baker Street and extending northerly to Baker Street. |
Awarded | ||
| PH023871.21WP | Regions 1, 3, 4, & 5 | White Painted Pavement Marking Lines. |
Awarded | ||
| PH023871.21P4 | Region 4 | Pavement Markings and Stenciling: Project is located in various locations in the Counties of Hancock, Penobscot and Washington. |
Awarded | ||
| 024925.00, 024927.00 | Edgecomb / Newcastle / Rockport | Pavement Milling and Ultra-Thin Bonded Wearing Course:
|
Awarded | ||
| 024881.00, 024883.00, 024885.00 | Sidney / Augusta | Pavement Milling, Hot Mix Asphalt Overlay, Cyclical Pavement Resurfacing, with Drainage and Safety Improvements:
|
Awarded | ||
| PH20210310SMN | Regions 1, 2, 3, & 4 | On Call Shoulder Machine - Equipment Rental Without an Operator. Awarded to the following:
|
Awarded | ||
| PH023871.21P123 | Regions 1,2, & 3 | Pavement Markings and Stenciling: Project is located in various locations in the Counties of Androscoggin, Franklin, Kennebec, Knox, Lincoln, Oxford, Piscataquis, Somerset and Waldo. |
Awarded | ||
| 024877.00 | Gray / North Yarmouth | Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Project is located on Route 115, beginning 0.12 miles east of Hillcrest Drive in Gray and extending southeasterly 4.90 miles to Walnut Road (Route 231) in North Yarmouth. |
Awarded | ||
| 024867.00 | Brunswick | Cyclical Pavement Resurfacing: Project is located on the Bath Road in Brunswick, beginning at the West Bath Town Line and extending west 1.94 miles to the Old Bath Road. |
Awarded | ||
| PH20210310SMO | Regions 1, 2, 3, & 4 | On Call Shoulder Machine - Equipment Rental with an Operator. Awarded to the following:
|
Awarded | ||
| 024917.00, 024919.00 | Dexter / Guilford / Sangerville | Pavement Milling, Ultra-Thin Wearing Course with Safety Improvements:
|
Awarded | ||
| 025643.00 | Milford | Light Capital Paving (lcp). |
Awarded | ||
| 024501.00 | Vassalboro | Light Capital Paving (lcp). |
Awarded | ||
| 024573.00 | Berwick | Light Capital Paving (lcp). |
Awarded |
