Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 024865.00, 024871.00 | Townships of Taunton & Raynham Academy Grant / Rockwood Strip T1 R1 NBKB / Big Moose | Pavement Milling and Cyclical Pavement Resurfacing:
|
Awarded | ||
| 024257.00, 024259.00 | Madison / Norridgewock | Cable Rail Replacement: Located in various locations in Somerset County. |
Awarded | ||
| 018769.21 | Alton / Benton / Clinton / Cumberland / Yarmouth / Falmouth / Fairfield / Oakland / Orono / Palmyra / Pittsfield / Veazie / Township of Argyle / Waterville / Bangor / Old Town | Pavement Grooving and Polyurea Painting: Located in Cumberland, Kennebec, Penobscot, Somerset & Waldo Counties in various locations, as described in the bid documents. |
Awarded | ||
| PH022812.00P | Ashland | Concrete and Miscellaneous Procurement, Supply and Deliver Precast Concrete, Geotextile, Geocell Confinement, plus other Incidental work. |
Awarded | ||
| 018995.34 | Carthage / Dixfield / Farmington / Phillips / Wilton | Crack Sealing:
|
Awarded | ||
| 020655.03 | Augusta | Located at the Augusta State Airport:
Please Note:
|
Awarded | ||
| PH20210407RAM | Beddington / Mopang Stream / T30 MD BPP / Crawford / Calais / Robbinson / Perry / Dennysville /Cherryfield / Sullivan (2 locations) / Hancock | 11 Seasonal Rest Areas - Maintenance, Cleaning and Light Carpentry |
Awarded | ||
| 023581.00 | Carroll Plantation | Large Culvert Replacement: Located on Route 6, approximately 1.38 miles north of Kossuth Township Townline at Lindsey Brook Bridge. |
Awarded | ||
| PH023486.00S | Ashland | Steel Procurement, Fabricate, Deliver Steel Materials and Bearings, plus other incidental work. |
Awarded | ||
| PH20210407RMJ | Jonesboro | Non-Interstate Roadside Mowing. |
Awarded | ||
| 024359.00 | Brunswick | Highway Lighting: Project is located on I-295 at exit 28 in Brunswick. |
Awarded | ||
| 024155.00 | Waterville | Pavement Milling, Hot Mix Asphalt Overlay, ADA Ramp Construction, and Sidewalk Rehabilitation with Drainage and Safety Improvements: Located on Route 11 in Waterville beginning 0.04 of a mile east of First Park Road and extending east 1.37 miles. |
Awarded | ||
| 024929.00 | Frankfort / Winterport | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Project is located on US Route 1A, beginning in Frankfort 0.04 miles north of the Prospect town line and extending north 4.27 miles. |
Rejected | ||
| 024139.00, 024149.00 | Moscow | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:
|
Awarded | ||
| 023154.00, 023168.00, 023549.00, 023176.00 | Bethel / Bowdoinham / New Sharon / Township of Lower Cupsuptic | Bridge Paint Projects:
|
Awarded | ||
| 018230.01 | Waldoboro | Wagner Number Two Bridge Replacement: Located on Winslow Mills Road/Route 32 over Hook Brook, approximately 3.1 miles northerly of Route 1 junction. |
Awarded | ||
| 024161.00 | Nobleboro / Waldoboro | Pavement Milling and Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Project is located on US Route 1 beginning, in Nobleboro 0.07 of a mile east of East Pond Road and extending East 3.31 miles. |
Rejected | ||
| 023170.00, 023172.00, 023202.00 | Pembroke / Cutler / East Machias / Machiasport | Bridge Paint Projects:
|
Awarded | ||
| 022326.00, 022350.00 | Limestone / Presque Isle | Bridge Paint Projects:
|
Awarded | ||
| 018995.14, 025669.00 | Baldwin / Biddeford / Cornish / Gorham / Limerick / Limington / Old Orchard Beach / Scarborough / Standish / Windham / Saco / Westbrook | Crack Sealing: Located in Cumberland & York Counties in various locations, as described in the bid documents. |
Awarded | ||
| 023667.00 | Lewiston | Pavement Milling, Hot Mix Asphalt Overlay with Drainage Improvements: Project is located on Sabattus Street, beginning 0.01 miles east of Main Street (Route 11) and extending east 2.09 miles to 0.01 miles east of Randall Road. |
Rejected | ||
| PH20210331CB4 | Region 4 | Catch Basin Cleaning and Vacuuming Work: Various locations in the Counties of Washington, Hancock, Penobscot, Piscataquis and Somerset. |
Awarded | ||
| 023599.00, 023605.00 | South Portland | Bridge Paint Projects, located in Cumberland County: Interstate 295 bridge number 6249 and 6532 over Westbrook Street/Route 9, located approximately 0.11 of a mile northeast of Interstate 295 Exit 3. |
Awarded | ||
| 022421.00, 023830.00, 023906.00, 023912.00 | Dresden | Instream Culvert Replacements: Projects are located on Route 127 and 128. |
Awarded | ||
| 025625.00 | Plantation of West Forks / Townships of Johnson Mountain / Parlin Pond / Town of Jackman | Pavement Milling, Cold In-Place Recycled Asphalt Pavement, Hot Mix Asphalt Overlay with Drainage Improvements: Project is located on US Route 201, beginning in West Forks PLT 0.08 miles south of the Johnson Mountain TWP town line and extending north 13.27 miles. |
Awarded | ||
| 023671.10, 023671.55 | Townships of T4 R9 NWP & Long A | Placement of Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage and Safety Improvements: Located on Route 11, beginning 0.01 miles south of T4R9 TWP town line and extending Northerly 5.45 miles. |
Awarded | ||
| 024165.00 | Gorham / Windham | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Project is located on US Route 202, beginning at the intersection with Route 25 in Gorham and extending north 3.76 miles south of Mechanic Street in Windham, not including Deguio Mill Bridge (#3762). |
Awarded | ||
| 024875.00 | Passadumkeag / Enfield | Pavement Milling and Cyclical Pavement Resurfacing: Project is located on US Route 2, beginning in Passadumkeag 0.05 of a mile northwest of the intersection with the Diamond Lumber Road and extending north 6.53 miles. |
Awarded | ||
| PH20210324ES5 | Region 5 | On Call Electrical Services: Various locations in the Counties of Washington, Penobscot and Aroostook. Awarded to:
|
Awarded | ||
| 024169.10, 024169.55 | Falmouth / Cumberland | Placement of Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage, Safety Improvements: Project is located on Route 9 in Falmouth and Cumberland, beginning 0.04 of a mile South of Sherman Drive in Falmouth and extending North 3.18 miles to 0.17 miles South of Wyman Way in Cumberland.
|
Awarded |
