Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 023661.00 | Portland | Washington Avenue Southbound over Interstate 295 Bridge Wearing Surface Replacement: Project is located on Washington Avenue Southbound over Interstate 295, Marginal Way, and Bayside Trail, approximately 0.1 of a mile southerly of Interstate 295 Southbound junction. |
Awarded | ||
| 026679.00 | Bowdoinham | Instream Culvert Replacements: Located on Route 24. |
Awarded | ||
| 021745.00, 023545.00, 023615.03 | Portland | Veranda Street Bridge Replacement, CNRR Crossing Bridge Rehabilitation, and Interstate 295 Southbound over Washington Avenue Bridge Rehabilitation.
Only bidders prequalified for this specific project through the Letter of Interest process earlier this year were allowed to submit bids. |
Awarded | ||
| PH20201014TS | Statewide | On Call Traffic Signal Maintenance Work - Statewide. Awarded to:
|
Awarded | ||
| 021162.20M, 021162.21M, 021162.22M, 021162.23M | Medway | Loaders/Supply loader without operator for use by the Department. |
Awarded | ||
| PH20201007R2H | Region 2 | Heating Preventative Maintenance & Repair Work: Located in various locations in Region 2. |
Awarded | ||
| 025340.10 | Augusta | Augusta Headquarters Air Conditioner Repairs Project: Located at the MaineDOT Building, Capitol Street, Augusta.
|
Awarded | ||
| 023557.00 | Jonesboro - Region 4 | Drisko Bridge Substructure Rehabilitation: Located on Station Road over Chandler River, approximately 2.5 miles westerly of Route 1 junction. |
Awarded | ||
| 021783.00, 023585.00, 023587.00 | Edgecomb | Intersection and Highway Safety Improvements:
|
Awarded | ||
| 022230.00, 022294.00 | Cherryfield | Schoodic Bridge Replacement and Covered Bridge Wearing Surface Rehabilitation:
|
Awarded | ||
| PH023581.10 | Carroll Plantation | Supply and Delivery of Precast Concrete Box Culvert: Located in Carroll Plantation on Route 6, 1.4 miles westerly of Kossuth Township townline. |
Awarded | ||
| 024887.00 | Portland | Park and Ride Shim and Overlay: Located in the Park and Ride lot on Marginal Way in Portland. |
Awarded | ||
| 022627.01 | Milo | Pleasant River Bridge Replacement: Project is located on Pleasant Street, over the Pleasant River, approximately 1.2 miles north easterly of Route 11 junction. |
Awarded | ||
| PH026731.00 | Houlton | Backslope Restoration: Project is located in the Town of Houlton, on roadside areas of Interstate 95 from South Bound on Ramp at mile 305 (46.133457, -067.791562) heading South, for a total footage of 5,096'. |
Awarded | ||
| 018915.40 | Eddington | Building Demolition: Project is located on 3 Cottage Lane in Eddington.
|
Awarded | ||
| 027067.00 | Randolph | Culvert End Remove, Reset and Slope Repair: Located on Route 226. |
Awarded | ||
| 023236.01 | T3 Indian Purchase TWP | Detective Benjamin Campbell Bridge Replacement: Located on Poplar Street/US Route 11 over the West Branch Penobscot River, approximately 1.7 miles westerly of the Millinocket town line. |
Awarded | ||
| 018767.01 | Woodstock | Highway Rehabilitation: Located on Route 26, beginning 0.06 mile east of Rumford Avenue and extends westerly 2.57 miles. |
Awarded | ||
| PH022192.00 | Frenchboro | Supply and Delivery of Generator: Delivered to 327 Thorsen Road, Hancock, Maine. |
Awarded | ||
| PH027001.21 | Standish / China / Sedgewick / Beddington / Houlton / Dallas Plantation | Supply and Delivery of Liquid Chloride Tanks, delivered to MaineDOT Maintenance Lots: Located in Standish, China, Sedgwick Beddington, Houlton and Dallas Plantation. |
Awarded | ||
| 026997.00, 026999.00 | Dixfield | Dixfield Maintenance Buildings Roof Replacement Project: Located at 547 Main Street. Please Note: A mandatory pre-bid meeting will be held at the MaineDOT Maintenance Facility located at 547 Main Street in Dixfield on September 02, 2020, at 10:00 AM. Only Contractors that attend the meeting will be allowed to bid. |
Awarded | ||
| 026285.00 | Readfield / Winthrop / Monmouth | Forestry and Canopy Clearing/located on Route 135. |
Rejected | ||
| 024083.00 | Canton | Slope Stabilization: Project is located on Route 140, beginning 0.45 mile easterly of Canton Point Road and extending westerly 0.31 mile. |
Awarded | ||
| 022224.00 | Auburn | Taylor Brook Bridge Replacement: Located on Hotel Road approximately 0.03 of a mile northerly of Chicoine Avenue. |
Awarded | ||
| 023234.01 | Mattawamkeag | Mattawamkeag Bridge Replacement: Project is located on Main Street/Route 2, over the Mattawamkeag River, approximately 0.2 of a mile southerly of Route 157. |
Awarded | ||
| 026231.00 | Randolph | Salt Storage Building: Located at the MaineDOT Maintenance lot on the Birmingham Road in Randolph. |
Awarded | ||
| 026321.00 | Topsfield | Cold Storage Building: Located at 35 South Road. |
Awarded | ||
| 024599.05 | Ashland / Castle Hill / Hersey / Fort Kent / Mount Chase / Moro PLT / Patten / Presque Isle / Wallagrass / T 11 R4 WELS | Shim: Located:
|
Awarded | ||
| 020894.00 | Auburn | Intersection Improvements: Located on Route 136 (Main Street), beginning at Academy Street with Main Street/Elm Street and Main Street/Minot Avenue and Elm Street/Minot Avenue and High Street. |
Awarded | ||
| 024893.00 | Bangor | Park and Ride Shim and Overlay: Located on the Odlin Road, 0.05 miles north of Interstate 395 in Bangor. |
Awarded |
