Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 025292.00 | Clinton / Benton / Fairfield / Sidney / Waterville / Augusta | Forestry Clearing on Interstate 95, Southbound and Northbound. |
Awarded | ||
| PH20190327OCP | Statewide | On Call Maintenance Paving. Awarded to:
|
Awarded | ||
| 021693.00 | Harrington | Johnson Bridge Culvert Replacement on Route 1A, approximately 1.4 miles easterly of Milbridge town line. |
Awarded | ||
| 023899.00 | Gorham | Higgins Bridge Culvert Replacement: Located on the Ossipee Trail/Route 25, approximately 1.7 miles southerly of the Standish town line. |
Awarded | ||
| 025574.00 | Waterville / Sidney | Forestry Tilling along Interstate 95, both Northbound and Southbound. |
Awarded | ||
| 022420.00, 022422.00, 023615.00. | Falmouth - Region 1 | Pavement Milling, Hot Mix Asphalt Overlay, Bridge Work, with Drainage and Safety Improvements:
|
Rejected | ||
| 022930.00P | Monson | Supply and Delivery of Precast Box Culvert: To be delivered to a project located in Monson on Route 6, approximately 0.4 mile south of the Shirley town line. |
Awarded | ||
| 023947.00 | Kenduskeag / Corinth / Charleston | Pavement Milling, Hot Mix Asphalt Overlay, Ultra-Thin Bonded Wearing Course with Safety Improvements: Located in Kenduskeag, beginning 3.50 miles north of the Glenburn town line and extending 9.08 miles north of the Charleston town line. |
Awarded | ||
| 011577.00, 021692.00 | Hampden | Highway Reconstruction and Bridge Replacement:
|
Awarded | ||
| 023048.00, 023631.00 | Kingfield / New Portland | Bridge Wearing Replacement Projects:
|
Awarded | ||
| 022432.00 | Mechanic Falls | Pavement Milling, Hot Mix Asphalt Overlay, with Safety Improvements. Located on Route 121 in Mechanic Falls, beginning at the Oxford/Mechanic Falls town line and extending easterly 2.14 miles to Route 24. |
Awarded | ||
| 022454.00, 023108.00, 023288.00, 023775.03 | Fort Fairfield / Presque Isle | Highway Rehabilitation, Pavement Milling, Hot Mix Asphalt Overlay, Bridge Work, with Drainage and Safety Improvements:
|
Awarded | ||
| 018995.22 | China / Palermo / Liberty / Montville / Searsmont / Morrill / Belmont / Freedom / Knox / Washington / Somerville / Dresden | Crack Sealing/located in Region 2, on Routes 3, 137, 17, and 27. |
Awarded | ||
| 023362.00, 023482.10, 023482.55 | Topsfield / Codyville PLT | Placement of the Plant-Mixed Recycled Asphalt Pavement, Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Located on Route 6 in Topsfield, beginning at the intersection of Route 6 and US Route 1 and extending northeast 6.37 miles to Codyville PLT. |
Rejected | ||
| 022456.00 | Augusta / Chelsea / Randolph | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Located in Randolph, beginning 0.02 miles north of Route 27 and extending 4.50 miles to Augusta. |
Awarded | ||
| 022297.00 | Pittston | Culvert Replacement on Route 27, in Pittston. |
Awarded | ||
| PH20190320OCS | Regions 1, 2, 3, & 4 | On Call Shoulder Machine - Equipment Rental with an Operator. Awarded to:
|
Awarded | ||
| 024502.00 | South Berwick | Painting Beam Ends and Bearings at the Great Works Bridge (#5343) on Brattle Street, in South Berwick. |
Awarded | ||
| 022410.00, 022445.00, 022446.00 | Orrington / Brewer / Old Town | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:
|
Rejected | ||
| 018995.32 | Mercer / Norridgewock / Farmington / Strong | Crack Sealing on Routes 4, and US Route 2.
|
Awarded | ||
| PH023682.00, PH025402.00, PH025446.00, PH025440.00 | Harrington / Dover-Foxcroft / T2 R8 NWP / Eagle Lake | Expansion Joint Armor Fabrication/Delivery locations as listed per Notice to Contractors. |
Awarded | ||
| 021890.00 | Portland / South Portland | Casco Bay Bridge Lighting Improvements on the city line, carrying Route 77 over the Fore River. |
Awarded | ||
| 024029.00 | Bristol | Pavement Milling, Cyclical Pavement Resurfacing, with Drainage Improvements: Located in Lincoln County, beginning in Bristol at the Damariscotta Town Line and extending south 9.62 miles |
Awarded | ||
| PH20190313OCF | Regions 2 & 4 | Forklifts-Equipment Rental without an Operator. Awarded to:
|
Awarded | ||
| 022132.00 | Portland | Signal Improvements and Sidewalk Ramp Reconstruction: In Cumberland County, project is located at five intersections along Congress Street, including High Street, Forest |
Rejected | ||
| 022418.00 | Falmouth | Hot Mix Asphalt Overlay with Drainage Improvements: Located on Route 9, beginning at Staples Point over the Presumpscot River and extending north to Lunt Road. |
Awarded | ||
| 023925.00, 023931.00 | Buxton / Gorham / Hollis / York | Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay, Hot Mix Asphalt Overlay, with Drainage Improvements.
|
Awarded | ||
| PH20190313VM | Regions 1, 2, & 3 | Vegetation Management along State Roadsides:
Awarded to:
|
Awarded | ||
| 025744.01, 025744.02A, 025744.02B, 025744.03A, 025744.03B, 025744.04A, 025744.04B, 025744.05A, 025744.05B, 025744.05C, 025744.05D | Statewide | Excavators/Supply Excavators without operator for seasonal use by the Department:
|
Awarded | ||
| PH021162.19R4 | Region 4 | Roadside Mowing/Non-Interstate in the Region 4 Areas in Enfield, Guilford, Orland & Eddington Crew Areas. |
Awarded |
