Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 021657.00 | Anson | Ice House Bridge Replacement/located on River Road/Route 8 & 201A over Gilman Brook approximately 0.05 of a mile southerly of Campground Road. |
Awarded | ||
| 022310.00 | Falmouth | Bridge Rehabilitation/located at the Presumpscot Falls Bridge/Allen Avenue extension over the Presumpscot River. |
Awarded | ||
| 022422.00 | Falmouth | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements./located on 495 in Falmouth, Eastbound and Westbound including all ramps to Interstate 295 and US Route 1. |
Awarded | ||
| 022825.00 | Athens | Wesserunsett Bridge Rehabilitation/located on South Main Street/Route 43 & 150 approximately 200 feet southerly of Route 151 junction. |
Awarded | ||
| 022336.00 | North Berwick | Staples Bridge Replacement/located on Card Mill road over Great Works river approximately 0.15 of a mile north easterly of Lebanon road junction. |
Awarded | ||
| PH20191127IDA | Augusta | HVAC Preventative Maintenance & Repair Work at MaineDot, 66 Industrial Drive. |
Awarded | ||
| 023909.00 | Gorham | Little River Bridge Replacement: Located on Mosher Road/Route 237, approximately 1.7 miles northerly of Main Street/Route 25 junction. |
Awarded | ||
| 021694.00 | Houlton | Bridge Replacement on Green Street, at Pearce Brook Number 6 Bridge. |
Awarded | ||
| PH20191127F&S | Statewide | Fire and Security Monitoring, Maintenance, Upgrades and Repair at MaineDOT facilities. |
Awarded | ||
| 022248.00 | Lovell | Bridge Replacement on the Harbor Road at Creek Brook Bridge. |
Awarded | ||
| PH20191127HWT | Statewide | Hazardous and Special Waste Transportation, Waste Management and Emergency Response Work. |
Awarded | ||
| PH021823.00P | Sanford / Alfred | Supply and Delivery of Precast Concrete Box Culvert: Delivered to project located in Cumberland County, on Route 202, Sanford/Alfred town line. |
Awarded | ||
| 026207.00 | Augusta | Demolition & Removal of one Building Unit, and any additions, located at 113 Leighton Road. |
Awarded | ||
| 018230.00 | Waldoboro | Wagner Number Two Bridge Replacement: Located on Winslow Mills Road/Route 32 over Hook Brook, approximately 3.1 miles northerly of Route 1 junction. |
Awarded | ||
| 023633.00 | New Sharon | New Muddy Brook Bridge Wearing Surface Replacement: Located on Farmington Falls Road/Route 2/27 over Muddy Brook, approximately 3.0 miles easterly of the Farmington town line. |
Awarded | ||
| 022346.00 | Pembroke | Pennamaquan Bridge Deck Replacement: Located on US Route 1, approximately 1.5 miles easterly of Route 214 junction. |
Awarded | ||
| 021703.00 | Standish | Watchic Bridge Replacement: Located on Route 113/Pequawket Trail over Page Brook, approximately 1.8 miles northerly of Route 25 junction. |
Awarded | ||
| PH20191113ELM | Statewide | Electrical Lighting Maintenance Work. Awarded on February 18, 2020, to:
|
Awarded | ||
| 022344.00 | Orono | Kelly Road Bridge Deck Replacement: Located on Kelly Road over Interstate 95, approximately 0.61 of a mile southeasterly of Stillwater Avenue. |
Awarded | ||
| 018826.00 | Howland | Large Culvert Replacement: Located on Route 116, approximately 0.34 mile northerly of the Edinburg town line. |
Awarded | ||
| PH20191113CHI | Augusta | Fleet Bridge Crane & Hoist Inspections & Repair Work. |
Awarded | ||
| 022964.00 | Presque Isle | Large Culvert Replacement on Route 164, approximately 0.16 mile southeast of the Chandler Road. |
Awarded | ||
| PH021831.00P | Stockton Springs | Supply and Delivery of Precast Concrete Box Culvert: Located on Route 1, 0.08 miles north of the intersection with Muskrat Farm Road. |
Awarded | ||
| PH20191106E&D | Statewide | On Call Excavators and Dozers - Equipment Rental without an Operator. Awarded on December 9, 2019, to the following:
|
Awarded | ||
| PH20191106R2M | Augusta | HVAC Controls and Building Automation System Maintenance & Monitoring at the MaineDOT 66 Industrial Drive Facility. |
Rejected | ||
| 018882.00 | Kingfield | Sidewalk Construction: Located on Route 142, beginning at the Kingfield Elementary School and continuing 0.57 miles northerly to the existing sidewalk at High Street. |
Awarded | ||
| 023621.00 | Kittery | Kittery Point Bridge Wearing Surface Replacement: Located on Whipple Road/Route 103 over Kittery Point, approximately 0.08 mile south easterly of Bowen Road. |
Awarded | ||
| PH20191030RAC | Statewide | On Call Air Compressors-Equipment Rental without an Operator. Awarded on November 25, 2019, to the following:
|
Awarded | ||
| 021162.19W, 021162.20W, 021162.21W | Region 1 | Compact Track Loader for yearly use by the Department. |
Awarded | ||
| PH20191030HQ | Augusta | HVAC Preventative Maintenance & Repair Work: Located at the MaineDOT Headquarters Building at 24 Child Street, Augusta, Me. |
Awarded |
